Marijn came up with the design of the mooring layout for the buoy:
![]() |
This morning the Field Team arranged to have a crane truck pick up the CREWS Buoy from the BAMSI warehouse and transport it to the Morgan's Bluff Dock and Harbor. Shortly thereafter, the Captain and Dive Team arrived with the boat, dive gear, two personnel from the Department of Meteorology, and Skye Minnet.
